<aside> ๐Ÿ“Œ PHASE 02 GOAL: Design and test a low to mid-fidelity POC (proof of concept) that effectively demonstrates prioritized functions. Final deliverable will include results based off of internal user testing.

</aside>

Documents

Market Analysis

๐Ÿ“‚ Product Requirements

Handoff Space

FigJam(n) ๐ŸŽธ

Demo Decks

Project Artifacts

The Team (๐Ÿ™Œ)

๐Ÿ—“๏ธย Calendar (Weekly )

Information Database (PS View)

POC Product Requirements Document ** work in progress**

Product Backlog

<aside> ๐Ÿ‘‹ This is where we prioritize the work to be done, and clarify what it is that weโ€™re doing. This is a living document that will continue with the project forever. Refinement of the PBIs (product backlog items) is an ongoing task for our team.

</aside>

Untitled

Cross Functional Liaison Meetings (depreciated)

Reference Material


๐Ÿ“Ÿย  Phase 01 Important Links & Documents

DEGRADED โ›”๏ธStrategy Team Meetings

DO NOT DELETE

Product Backlog