Project Kickoff: 04/01 🎉
<aside> 👉🏼 Philly Truce Product Strategy Meeting: Every Thursday, 10am-11am
</aside>
<aside> ‼️ Philly Truce Product Requirements Document -Working PRD
</aside>
<aside> đź“ť Working Documents
Important Links
Quinn made this document called Project Charter – super helpful and a
high level view of what we are doing
-As discussed in today’s Product meeting, we will all be reading the product charter.
ď‚· Philly Truce Product Strategy Phase 1 Hand-off Doc
- The Phase 1 handoff doc summarizes the roles, processes, communication channels, & tools used by the Product Strategy Team during Phase 1. The doc also describes the challenges faced by the team during phase 1 as well as the outputs of the team during the initial phase. I attached a more in depth summary below.
Product Strategy Phase 1 Hand-off Doc Summary **
-Aaron
ď‚·Product Requirements Document from Phase 1
-Summary: https://docs.google.com/document/d/1srgHYDOHcGyVB-XZ2DJyY3q-XzBN_lSZb7cWhgmbbio/edit?usp=sharing
-Rida
ď‚·Design Priority file I found on Figma from Phase 1
-Summary: https://docs.google.com/document/d/1kOUX_tIV5xHx4MokydNO-zl-wlh6GCaRHmugCRIkAu4/edit?usp=sharing
-Rida
ď‚·Problem Statement( How it was generated?) from Phase 1
*-*The Problem Statement Doc was created using Figma during a Problem Statement Workshop, although this document doesn’t have any information related to the Philly Truce Project. Maybe it was used as an example in Phase 1? Or to develop user stories? The Doc mentions “Village Sisters” throughout, maybe it was used for a previous project? Brief summary attached below.
Philly Truce Problem Statement Doc Summary
-Aaron
ď‚·Product Vision Doc from Phase 1
-The Product Vision Doc is mainly a centralized document that they kept to have a place housing all the important parts of their work. It is more akin to a skeleton of a PRD that hasn’t been fully fleshed out. I would say there is not much information that we don’t already know from the PRD and the handoff document that we received from Phase 1.
-Luis
ď‚·Product Strategy Team Workspace from Phase 1
-TO DO: The FIgma file like the name implies is their shared work space where they kept notes from meeting and vision boarding. I would say the most important parts are located in their vision boarding session and their MVP section.
-Luis
</aside>
Sprint | Goals | Product | Dev | Research | Due Date |
---|---|---|---|---|---|
1 | **- Auditing all design and content work |