<aside> 🌵 The product backlog is an ordered list of requirements and ideas that are needed to build the product and overall user experience.

</aside>

Backlog Refinement Guide


Attendees:

Duration: 1–4 hours, depending on the Sprint length

Frequency: Once per Sprint, usually after the midpoint of the Sprint

Objective: Inspect and Adapt the Product Backlog and PBIs to ensure targeted PBIs are ready

for the next Sprint

Topics covered:

Output:

The Scrum Master ensures the event takes place and is well-facilitated. Scrum Master also ensures the time-box is adhered to.