<aside> 🌵 The product backlog is an ordered list of requirements and ideas that are needed to build the product and overall user experience.
</aside>
Attendees:
Duration: 1–4 hours, depending on the Sprint length
Frequency: Once per Sprint, usually after the midpoint of the Sprint
Objective: Inspect and Adapt the Product Backlog and PBIs to ensure targeted PBIs are ready
for the next Sprint
Topics covered:
Output:
The Scrum Master ensures the event takes place and is well-facilitated. Scrum Master also ensures the time-box is adhered to.